Paper The following article is Open access

Assembly Installation studies for the ITER cryoline system

, , , , , , and

Published under licence by IOP Publishing Ltd
, , Citation S Badgujar et al 2017 IOP Conf. Ser.: Mater. Sci. Eng. 171 012051 DOI 10.1088/1757-899X/171/1/012051

1757-899X/171/1/012051

Abstract

The ITER cryoline (CL) system consists of a complex network of vacuum insulated multi and single process pipe (PP) lines distributed over three different areas at ITER site. The installation of these CLs in the Tokamak building is a very challenging and highly integrated task due to the presence of many equipment in their vicinity. Dedicated study has been performed to develop the realistic plan and to figure out constraints for complete realization of the CL network. This study includes the concept for assembly and installation of CLs within restricted premises of the Tokamak building, to fulfil the objective of generating technical inputs, defining the processes, construction sequence, tooling, resources and thorough understanding of one of the most challenging network of CLs in present time. The installation sequence for all the CLs inside Tokamak building has also been developed to respect the ITER Construction Master Schedule. The paper describes the ITER CL system, the assembly and installation plan developed considering the layout constraints and complexity arising from the integrated installation in the Tokamak building.

Export citation and abstract BibTeX RIS

Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.

Please wait… references are loading.
10.1088/1757-899X/171/1/012051